Windows 10: Cannot remove language from, and change order of, keyboard layouts

Discus and support Cannot remove language from, and change order of, keyboard layouts in Windows 10 Software and Apps to solve the problem; I am running Windows 11 Home, and I am having trouble with keyboard layouts. The two keyboards I want are English United Kingdom, and Japanese, with... Discussion in 'Windows 10 Software and Apps' started by Scleractinian, Sep 8, 2023.

  1. Cannot remove language from, and change order of, keyboard layouts


    I am running Windows 11 Home, and I am having trouble with keyboard layouts. The two keyboards I want are English United Kingdom, and Japanese, with English as the default. I am having the following problems:No matter what I do, I can't get rid of English United States from the list of keyboard layouts, see here. I have completely removed English United States from the Language & Region settings, so I am not sure why it still appears.Japanese appears as the default keyboard layout, despite moving English United Kingdom above it in Language & Region settings. Nothing I do seems

    :)
     
    Scleractinian, Sep 8, 2023
    #1
  2. ryloth Win User

    Unable to remove a 'default' language/keyboard layout

    Dear dalchina,
    thank you for the reply, but I am probably missing something.
    As you can see from the attached picture, language settings DOES NOT list the keyboard layout I want to remove (ENG INTL). So, how can I remove a layout that is not listed in the Language settings?

    Gianluca

    Cannot remove language from, and change order of, keyboard layouts 224139d1549971631t-unable-remove-default-language-keyboard-layout-capture.png
     
    ryloth, Sep 8, 2023
    #2
  3. Lekden Win User
    Can't (completely) remove language keyboard layout

    Yup, no such luck. My next step will be to temporarily install another language as the system language (like English UK or something), and remove US English as the default language and the keyboard, and everything, and then reboot and install it again and see if that does anything....

    But I am betting it won't. And my reason is because when I was inspired to make my own keyboard layout I downloaded one another person had made, whidch was based on English UK keyboard, and it did not work correctly for me so I uninstalled it (and have since improved, I think, upon what he had done,) and I just now realized that that keyboard, which was under English language and keyboard, is still in my list as well. When I had installed it then UK English had become one of the available languages, and I have since removed it from being active and so forht. So, basically I did to UK English what I am propsing to do for US English... and yet that old keyboard layout remains.

    There has to be somewhere that Windows keeps references all the different keyboard layouts available for the different language packs installed.... The question is where is that and how to modify it?
     
    Lekden, Sep 8, 2023
    #3
  4. Arun B J Win User

    Cannot remove language from, and change order of, keyboard layouts

    Windows 10 "Update" Changed keyboard layout on welcome screen and I can't change it back.

    Hi,



    I understand your concern and will assist you to resolve the issue.


    • How many keyboard language have you installed?
    If you have installed more than 1 keyboard language in your system, then I suggest you to remove the keyboard language other than default language and check if it helps.

    Follow the steps to remove the language.


    • Open Control panel.

    • Click on language.

    • Select the language and click on remove option at the top.


    And also refer the link below and check if it helps.

    Change your keyboard layout - Microsoft Support



    Keep us posted on this issue so that we can assist you better.
     
    Arun B J, Sep 8, 2023
    #4
Thema:

Cannot remove language from, and change order of, keyboard layouts

Loading...
  1. Cannot remove language from, and change order of, keyboard layouts - Similar Threads - Cannot remove language

  2. remove ENGUK keyboard layout from language bar

    in Windows 10 Gaming
    remove ENGUK keyboard layout from language bar: Hello,Under Settings > Time & language > Language & region there are two languages listed: English United States and Greek.However, in the language bar, suddenly was added the English United Kingdom keyboard layout, along with the two other layouts that were all the time...
  3. remove ENGUK keyboard layout from language bar

    in Windows 10 Software and Apps
    remove ENGUK keyboard layout from language bar: Hello,Under Settings > Time & language > Language & region there are two languages listed: English United States and Greek.However, in the language bar, suddenly was added the English United Kingdom keyboard layout, along with the two other layouts that were all the time...
  4. I can't remove a language from the keyboard layout

    in Windows 10 Gaming
    I can't remove a language from the keyboard layout: Hi, I bought a laptop from Germany so naturally it booted and everything in German but I don't speak German so I changed display language, typing and everything to English and as an extra in Greek since I am Greek But the language keeps reverting to German and I cant remove...
  5. Cannot remove language from, and change order of, keyboard layouts

    in Windows 10 Gaming
    Cannot remove language from, and change order of, keyboard layouts: I am running Windows 11 Home, and I am having trouble with keyboard layouts. The two keyboards I want are English United Kingdom, and Japanese, with English as the default. I am having the following problems:No matter what I do, I can't get rid of English United States from...
  6. How to change the keyboard layout order for the SAME language in Language Options

    in Windows 10 Gaming
    How to change the keyboard layout order for the SAME language in Language Options: I use two languages in my desktop: Italian and English. I also use two different Italian keyboards layouts: the standard one and an enhanced one with several more characters by using AltGr. In Windows settings I can reorder languages but not layouts in the same language. In...
  7. How to change the keyboard layout order for the SAME language in Language Options

    in Windows 10 Software and Apps
    How to change the keyboard layout order for the SAME language in Language Options: I use two languages in my desktop: Italian and English. I also use two different Italian keyboards layouts: the standard one and an enhanced one with several more characters by using AltGr. In Windows settings I can reorder languages but not layouts in the same language. In...
  8. W11. Remove extra languages from keyboard layout

    in Windows 10 Gaming
    W11. Remove extra languages from keyboard layout: I want to remove ENG English US and Japanese Microsoft IME layouts options number 2 and number 3. I Want International layout since i need accents because I live in a latam country :DBut i don't' know how. This is my language and region settingsI mainly want to remove options...
  9. W11. Remove extra languages from keyboard layout

    in Windows 10 Software and Apps
    W11. Remove extra languages from keyboard layout: I want to remove ENG English US and Japanese Microsoft IME layouts options number 2 and number 3. I Want International layout since i need accents because I live in a latam country :DBut i don't' know how. This is my language and region settingsI mainly want to remove options...
  10. How to Change the Order of Keyboard Layouts

    in Windows 10 Customization
    How to Change the Order of Keyboard Layouts: I have three keyboards layouts on my latest Windows 10 OS: English, Ukrainian and Chinese. Initially the order was such: English > Ukrainian > Chinese and then back to English. Some time ago, for some reason, this order changed and it is English > Chinese > Ukrainian now....